Subcontracting works:
- Installation of monolithic grillages, columns, beams, floors
- Manufacturing and installation of metal structures
- Reinforced concrete flooring
- Installation of sandwich panels
- Finishing, etc.
About the project:
General contractor: MEGALINE
Built-up area: 21 ha
Total area: 85,000 m2
Number of storeys: 1-2 floors
Parking: 2500 m/rooms